Set Up CSIP-AUS Compliance
Australian regulations require this system to support CSIP-AUS so the grid operator (DNSP) can manage energy export.
About Voltello LinkPro
▾
Voltello LinkPro is a compliance gateway by Village Energy that receives DNSP dispatch instructions and controls this system's energy export via Modbus TCP.
If Voltello LinkPro goes offline, this system will automatically cap export power at the fallback limit you set below.
What you need to set up
Voltello LinkPro Serial Number
Offline Site Export Limit
Offline fallback only
kW
Only applies if Voltello LinkPro goes offline — not a permanent limit. Enter the value required by your local DNSP regulations.
After submitting, you'll be guided to install Voltello LinkPro and verify the connection.